[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[Scheme-reports] R7RS 7th draft available
- To: scheme-reports <scheme-reports@x>
- Subject: [Scheme-reports] R7RS 7th draft available
- From: Alex Shinn <alexshinn@x>
- Date: Sat, 10 Nov 2012 15:30:04 +0900
[Sent to multiple lists via bcc.]
The seventh and semi-final draft is available at:
http://trac.sacrideo.us/wg/raw-attachment/wiki/WikiStart/r7rs-draft-7.pdf
This includes many changes from the 6th draft,
including those resulting from the many formal
(and informal) comments we received. Thanks
to everyone who helped!
The Steering Committee will form an electorate
and call for ratification based on this draft, after
which we will fix any errors in the eighth and final
draft. Any issues arising after that point will be
tracked separately in an errata list.
A release of chibi-scheme with all changes up to
this point will be made shortly, along with a full
R7RS test suite.
--
Alex
_______________________________________________
Scheme-reports mailing list
Scheme-reports@x
http://lists.scheme-reports.org/cgi-bin/mailman/listinfo/scheme-reports